Search
  • MH Professional Eng.

New Athletics Field House Reaches Completion

MH Professional Engineering served as the Lead Electrical Engineer for the design of a new 92,000-square-foot Athletics Field House for the State University at Buffalo.

Located just beyond the north end zone of the UB Stadium on the North Campus, the multi-use facility, called the Murchie Family Field House, not only houses a full-size football field, but also feature 6,000 feet of rubber track for sprint practice, as well as long/triple jump and pole vault pits. It also contains motorized suspended softball hitting tunnels.

Congratulations UB!

Murchie Family Field House


#MurchieFieldhouse #SUNYBuffalo #Athletics #Engineering #NorthCampus

0 views

Phone: (518) 280-6522  I  Fax: (518) 280-6526  I  5 Corporate Drive, Clifton Park, NY 12065

© 2020 mhproengineering.com

  • Facebook - Black Circle
  • LinkedIn - Black Circle