top of page
Search

New Athletics Field House Reaches Completion

  • Writer: MH Professional Eng.
    MH Professional Eng.
  • Mar 10, 2023
  • 1 min read

MH Professional Engineering served as the Lead Electrical Engineer for the design of a new 92,000-square-foot Athletics Field House for the State University at Buffalo.

Located just beyond the north end zone of the UB Stadium on the North Campus, the multi-use facility, called the Murchie Family Field House, not only houses a full-size football field, but also feature 6,000 feet of rubber track for sprint practice, as well as long/triple jump and pole vault pits. It also contains motorized suspended softball hitting tunnels.

Congratulations UB!

Murchie Family Field House


 
 

Phone: (518) 280-6522  I  Fax: (518) 280-6526  I  320 Ushers Road, Suite 2, Ballston Lake, NY 12019

© 2024 mhproengineering.com

bottom of page